Is liquid screed right for my floor?

Pick three things about your floor and the check gives a plain answer on liquid screed, the depth and drying time for both kinds, and what your floor finish needs.

It's an estimate, not a quote. The button under it hands your answers to the quote form, so the contractor who rings you starts from the same figures.

Free, no obligation. One local screeding contractor prices it, not five.

Is liquid screed right for my floor?Three taps: depth, drying and what goes on top.
1Underfloor heating?
2Roughly how big?
3What's going on top?

Liquid screed suits this floor. It flows round the pipes with no air gaps, can be 25 mm over them, and is thinner than the 65 mm a floating sand and cement screed needs in a house.

Calcium sulphateCement-based
Depth41 mm (46 mm at the nominal 30 mm cover)45 mm
Dry, good conditionsabout 42 daysabout 50 days
Heating on fromday 7, up to 50°Cday 14, up to 45°C
Surface before flooringsand off the laitance (low-laitance mixes need less)lightly abrade and clean
Biggest bay300 m², so 1 (one pour)40 m², so up to 2
  • With the heating used to dry it, the heat-up cycle (15°C, up 5°C a day to 50°C, 7 days there, back down, 48 hours off) puts the first moisture test at about day 31.
  • Tiles: prime first. On calcium sulphate, cement-based adhesive needs the screed at 75% RH; a calcium sulphate based adhesive can sometimes go on at 87% RH (ask the adhesive maker).

How this is worked out

WhatRule
Depth, no heatingFloating minimum in a house: 35 mm calcium sulphate, 45 mm cement-based
Depth, with heatingPipe + 25 mm cover, never under the floating minimum; a 16 mm pipe is assumed
Drying1 mm a day to 40 mm, then 2 days a mm, in good conditions
Heating onDay 7 up to 50°C (calcium sulphate); day 14 up to 45°C (cement-based liquid screed)
First test, heatedDay 7 + a 22-day cycle + 48 hours off = about day 31
BaysHeated 300 / 40 m², unheated 1,000 / 80 m²
Finish limits75% RH; 87% RH for calcium sulphate adhesives where the maker allows

What it can't know

  • Your pipe size and spacing: the heating designer's drawing has them.
  • Your floor zone: the finished floor level on the drawings sets the room for insulation and screed.
  • Your site: a cold, damp building in January dries far slower than good conditions.
  • Your finish's own limit: wood suppliers often ask for drier screed than 75% RH.

Liquid screed poured by the contractor who takes your call

Calls on this site ring JAM Floor Screeding: James Mulhall, based in Portlaoise, 25 years laying floors. Lines open Mon to Sat, 7am to 6pm. These are his jobs.

A liquid screed floor poured between block walls, edge strip still showing along the base
Liquid screed
A freshly poured liquid screed floor, still wet and shining, in a block-built room
Liquid screed floor
Underfloor heating pipes clipped down in rows across a floor, ready for the screed
Underfloor heating ready for screed

“JAM were punctual, professional and efficient and did an outstanding job on pouring our new floor as part of a renovation. Very highly recommend!”

David O'Keeffe, Google review

“Excellent work, laser level finish, neat and tidy worker, highly recommend.”

Cathal Kelly, Google review

“Top class work by james and his crew, highly recommend”

the duke, Google review

Quoted word for word from JAM Floor Screeding's Google reviews. Read them on Google

Get your floor priced in 4 quick taps

Tell us about the floor. It goes to one screeding contractor who covers your county, and they ring you to price it.

What's the floor?

Pick the closest one.

By sending, you agree to Liquid Screed passing your details to one screeding contractor who covers your county, so they can contact you about the floor. Privacy notice

Liquid screed guides & price breakdowns

Straight answers to what people ask most: itemised costs, specifications, planning or grants, and what to check before you book.

More guides & resources: Tiles, wood and vinyl on liquid screed · Joints and bay sizes · Is liquid screed right for my floor ? · All guides & calculator hub · Technical & trade glossary · Frequently asked questions · All areas covered · About this site

Floor check questions

Is the floor check a quote?

No. It's the minimum depths and drying rules applied to your answers. The contractor prices the real floor.

Why does it show two answers?

Calcium sulphate and cement-based liquid screeds have different depths, drying and bay limits. Seeing both helps you ask for the right one.

What pipe size does it assume?

16 mm, a common size in houses. Your heating designer's drawing gives the real one.

What happens when I press Get this floor priced?

Your answers are ticked on the quote form below and a short note is added for the contractor. Nothing is sent until you add your number and press Send.

Liquid screed across all 26 counties

Requests from all 26 counties go to one vetted local specialist who covers your county — from Dublin, Cork, Galway and Limerick to Kildare, Meath, Wicklow, Waterford and Donegal. Pick your county below for local prices, specifications and advice. Compare all areas covered →

Get a free quote for your floor

Four taps and your number. One screeding contractor who covers your county rings you with a price. Nothing is booked until you say yes.