Screed moisture testing
Before flooring goes on, the screed is tested for moisture. The usual limit is 75% relative humidity. Calcium sulphate: 75% RH or 0.5% moisture. Cement-based: under 75% RH, about 2% by the carbide method.
Three methods: a hair or digital hygrometer, a carbide bomb, or an oven test. With underfloor heating, the heating is switched off for 48 hours before testing.
Free, no obligation. One local screeding contractor prices it, not five.
The limits
| What goes on top | Calcium sulphate | Cement liquid (cement-based liquid screed) |
|---|---|---|
| Cement-based adhesive or smoothing compound | 75% RH (0.5%) | Under 75% RH (about 2% carbide) |
| Calcium sulphate based adhesive or compound | Often 87% RH (1.5%): ask the maker | Not applicable |
| Wood or vinyl | 75% RH (0.5%) | Under 75% RH |
| Surface liquid DPM | Only after 28 days, under 87% RH, and no underfloor heating | Possible: follow the DPM maker |
The methods
- HygrometerA sealed hood or box on the screed surface; the air inside comes to balance with the screed and the meter reads its relative humidity. A hygrometer with a humidity box is the usual kit.
- Carbide test
A sample is drilled out and sealed in a pressure vessel with calcium carbide; the pressure gives the moisture content as a percentage.- Oven test
A sample is weighed, dried and weighed again. - Carbide test
Wood floors are stricter
BS 8201 treats 75% RH as acceptable for wood flooring, but many wood flooring suppliers say that's for floating wood floors only and ask for drier screeds. Get the wood supplier's figure in writing before the test, so everyone is working to the same number.
Who tests, and when
- It's the floor fitter's job to measure the moisture and choose the adhesive and preparation.
- With heating: after the commissioning cycle and 48 hours off.
- Test where it dries slowest: the thickest part, corners, and away from windows.
- Keep the result with the date, the method and where it was taken. It's the record if a floor fails later.
Liquid screed poured by the contractor who takes your call
Calls on this site ring JAM Floor Screeding: James Mulhall, based in Portlaoise, 25 years laying floors. Lines open Mon to Sat, 7am to 6pm. These are his jobs.



“JAM were punctual, professional and efficient and did an outstanding job on pouring our new floor as part of a renovation. Very highly recommend!”
“Excellent work, laser level finish, neat and tidy worker, highly recommend.”
“Top class work by james and his crew, highly recommend”
Quoted word for word from JAM Floor Screeding's Google reviews. Read them on Google
Get your floor priced in 4 quick taps
Tell us about the floor. It goes to one screeding contractor who covers your county, and they ring you to price it.
Liquid screed guides & price breakdowns
Straight answers to what people ask most: itemised costs, specifications, planning or grants, and what to check before you book.
More guides & resources: Tiles, wood and vinyl on liquid screed · Joints and bay sizes · Is liquid screed right for my floor ? · All guides & calculator hub · Technical & trade glossary · Frequently asked questions · All areas covered · About this site
Moisture testing questions
What moisture level does liquid screed need before flooring?
75% RH for most finishes. 75% RH or 0.5% for calcium sulphate. Under 75% RH, about 2% carbide, for cement-based.
How is screed moisture tested?
With a hygrometer under a sealed hood, a carbide test on a drilled sample, or an oven test.
Can tiles go on at 87% RH?
On calcium sulphate, with a calcium sulphate based adhesive, sometimes. 87% RH may be possible with some adhesives: ask the adhesive maker first.
Who is responsible for the moisture test?
It's the floor fitter's job to measure the moisture and choose the right adhesive and preparation.
Liquid screed across all 26 counties
Requests from all 26 counties go to one vetted local specialist who covers your county — from Dublin, Cork, Galway and Limerick to Kildare, Meath, Wicklow, Waterford and Donegal. Pick your county below for local prices, specifications and advice. Compare all areas covered →
Get a free quote for your floor
Four taps and your number. One screeding contractor who covers your county rings you with a price. Nothing is booked until you say yes.
