Liquid screed vs sand and cement

Liquid screed goes down thinner and faster: 35 mm floating in a house (calcium sulphate) against 65 mm for sand and cement, and up to 1,500 m² a day against up to 150 m².

Sand and cement can be laid to falls, needs no pump and no special primer, and is what most floors in older Irish houses already have. The rest is in the table.

Free, no obligation. One local screeding contractor prices it, not five.

Side by side

LiquidLiquid (cement, cement-based liquid screed)Sand and cement
Floating, house35 mm45 mm65 mm
Unbonded30 mm50 mm50 mm minimum, 70 mm specified
Bonded25 mmNot given25 mm minimum, 40 mm specified
Over heating pipes25 mm25 mmWithin the 65 mm floating depth
Reinforcement, floatingNone neededNone statedD49 mesh or fibres
Laid per dayUp to 1,500 m²Up to 2,000 m²Up to 150 m²
CuringSelf-curingNo extra curingCovered for at least 5 days
Dry, good conditions35 days at 35 mm50 days at 45 mmAbout 2 months at 50 mm, about 100 days at 75 mm
Biggest bay, unheated1,000 m²80 m²36 m², 6 m long
Laid to fallsNoNoYes

When sand and cement is the better call

  • A floor that has to fall to a drain, like a level-access shower.
  • One small room, where a pump and a truck cost more than the labour they save.
  • A bonded topping on an old slab where only 25 to 40 mm is available and a cement adhesive goes straight on.
  • A fast-drying sand and cement screed, when flooring has to go down in days, not weeks.

Sand and cement, fast-drying and lime screeds for houses are covered on floorscreeding.ie. For larger jobs priced by the m², see screeding.ie's specification guide.

When liquid is the better call

  • Underfloor heating, especially a heat pump, where every millimetre over the pipes slows the response.
  • A big open-plan ground floor, where sand and cement would need joints every 6 m.
  • A tight floor zone: a thinner screed leaves room for more insulation.
  • Several houses or apartments, where a crew can pour a whole block in a day.

Liquid screed poured by the contractor who takes your call

Calls on this site ring JAM Floor Screeding: James Mulhall, based in Portlaoise, 25 years laying floors. Lines open Mon to Sat, 7am to 6pm. These are his jobs.

A liquid screed floor poured between block walls, edge strip still showing along the base
Liquid screed
A sand and cement screed floor in a new build with insulated walls
Sand and cement screed, new build

“JAM were punctual, professional and efficient and did an outstanding job on pouring our new floor as part of a renovation. Very highly recommend!”

David O'Keeffe, Google review

“Excellent work, laser level finish, neat and tidy worker, highly recommend.”

Cathal Kelly, Google review

“Top class work by james and his crew, highly recommend”

the duke, Google review

Quoted word for word from JAM Floor Screeding's Google reviews. Read them on Google

Get your floor priced in 4 quick taps

Tell us about the floor. It goes to one screeding contractor who covers your county, and they ring you to price it.

What's the floor?

Pick the closest one.

By sending, you agree to Liquid Screed passing your details to one screeding contractor who covers your county, so they can contact you about the floor. Privacy notice

Liquid screed guides & price breakdowns

Straight answers to what people ask most: itemised costs, specifications, planning or grants, and what to check before you book.

More guides & resources: Tiles, wood and vinyl on liquid screed · Joints and bay sizes · Is liquid screed right for my floor ? · All guides & calculator hub · Technical & trade glossary · Frequently asked questions · All areas covered · About this site

Liquid vs sand and cement questions

Is liquid screed better than sand and cement?

For underfloor heating and large floors, usually: it's thinner, faster to lay and flatter. For floors laid to falls, small rooms and bonded toppings, sand and cement often makes more sense.

Is liquid screed thinner than sand and cement?

Yes. Floating in a house: 35 mm calcium sulphate, 45 mm cement-based liquid screed, 65 mm sand and cement.

Does liquid screed dry faster?

Per mm, about the same at first: 1 mm a day to 40 mm against 1 mm a day to 50 mm (BS 8204-1). It dries sooner because it's thinner, and calcium sulphate can be force dried with the heating from day 7.

Does liquid screed crack?

It shrinks less than sand and cement: 0.02% at most for calcium sulphate, under 400 microns a metre for cement-based. Joints in the right places still matter.

Liquid screed across all 26 counties

Requests from all 26 counties go to one vetted local specialist who covers your county — from Dublin, Cork, Galway and Limerick to Kildare, Meath, Wicklow, Waterford and Donegal. Pick your county below for local prices, specifications and advice. Compare all areas covered →

Get a free quote for your floor

Four taps and your number. One screeding contractor who covers your county rings you with a price. Nothing is booked until you say yes.